Hello, OTM Community...We have a possibility of using 1 to 2 TL's to linehaul for a pool point. 1 TL is always available for the linehaul to the pool point. We need to have the most cost effectiveness be on the first trailer.
The possible 2nd trailer would depend on the cost against direct LTL shipments and the capacity of the carrier. The 2nd TL may not always be available, so we always want to maximize savings in the 1st TL. How is the best way to do this in OTM 5.0?
Thanks for your input,
OTMGAL
The possible 2nd trailer would depend on the cost against direct LTL shipments and the capacity of the carrier. The 2nd TL may not always be available, so we always want to maximize savings in the 1st TL. How is the best way to do this in OTM 5.0?
Thanks for your input,
OTMGAL